Project: MattJ   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Jun 26, 2020     Pitot Installation - (25 hours)       Category: Wings
Assembled all 5 inspection plates since I needed one for the Pitot installation. GAP 26 with auto controller . Marked Pitot & AOA tubes. Added Garmin control wire thru the wings.The control box will mount to the inside of the inspection plate. Pitot Tube is difficult to install because of the quick built wings and having to do much of the work thru an inspection panel. Got a tip from a Hill AFB mechanic to save my arms


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.